Services

What we do

What Argyll does for new sites, for hosts moving off ChargePlace Scotland, and for the operators and installers who build the chargers.

Grant-funded charging for rural and island sites

We find out whether your site qualifies, confirm the band, and bring you written proposals from operators and installers. No cost to you.

The Rural and Island Infrastructure Fund, run by Energy Saving Trust for Transport Scotland, pays for publicly accessible electric vehicle chargers on private land in rural Scotland. On the islands and in remote rural postcodes, more than 30 minutes from a town, it covers 100 per cent of eligible costs, up to the cap for each unit. In rural postcodes nearer a town, and in the most remote small towns, it covers 75 per cent.

Argyll confirms the band from your postcode, arranges a site suitability check, and approaches charge point operators and installers on your behalf. You receive written proposals and choose whether, and with whom, to go ahead. The application is made in your name, or by your chosen operator on your behalf, and installation follows the grant offer.

  • Eligibility confirmed from the postcode, not guessed
  • A site check before anyone quotes
  • Written proposals from operators and installers who are on the fund’s own supplier list
  • The fund’s conditions explained before you sign: public access around the clock for five years, a public map listing, a back-office contract
  • Argyll is an introducer. We do not install, operate, or take a share of charging income

At a glance

Grant, islands and remote rural
100 per cent
Grant, accessible rural
75 per cent
Offers accepted by
15 December 2026
Works claimed by
16 March 2027
Host obligation
Public access, five years
Cost to the host
None

ChargePlace Scotland transition

If you host a charger on ChargePlace Scotland, it has to move to a new operator by 31 December 2026, and a grant pays to replace units too old to move. We find the operator and support the application.

Public chargers on the ChargePlace Scotland network must move to a new operator, and a unit on the old OCPP 1.5 protocol cannot make the move and has to be replaced. The CPS Transition Fund pays for a like-for-like replacement of a rural unit that is at least five years old or on OCPP 1.5, but the owner has to apply, a committed operator is a condition of applying, and the dates are tight: units off the old network by 31 December 2026 and works complete by 15 March 2027.

Argyll checks which of your units are affected, finds an operator prepared to commit to the site, and supports the application. Lead times run to about three months, so this is worth starting now. What to do before 31 December sets out the move, the fund and the steps in full.

At a glance

Off ChargePlace Scotland by
31 December 2026
Replacement works by
15 March 2027
Who applies
The owner
Condition
A committed operator
Lead time
About three months

For operators and installers

Qualified rural and island sites, eligibility checked and authority signed, ready for a proposal.

A fund application needs a site, a landowner’s authority and an operator’s quote before it exists. Argyll supplies the first two. Every site we introduce has had its postcode checked against the fund’s own rural classification, a suitability check arranged, and a letter of authority signed by the business that owns or controls the land.

We work with operators and installers on the Energy Saving Trust supplier list, and we are paid by you, on terms agreed per site, never by the host. If you cover the islands or the Highlands, where the fund’s take-up has been lowest and its grant highest, talk to us.

At a glance

What you receive
Eligibility-checked sites with a signed authority
Where
Argyll, the Highlands, the islands
Fee
By agreement, per site
Paid by
You, never the host

Get in touch

Tell us what you need

Send a message or call. We reply within one working day.